STUDI KELAYAKAN PENGEMBANGAN AKSES CEMOROKANDANGTLOGOWARU, KECAMATAN KEDUNGKANDANG KOTA MALANG
Keywords:
Malang-Pandaan Toll Road, Alternative New Road, Feasibilty StudyAbstract
The existence construction of Malang - Pandaan Toll Road will have an impact on increase volume vehicle and mobilitation people or goods in Malang city. Although, existing condition shows growth of road is still low if compared than growth of vehicle. This is certainly going to accessibility in the Malang city hampered. For anticipating the impact construction of Malang - Pandaan Toll Road in Ki Ageng Gribik road, it required development new road on eastern side that near exit Toll Road. Before doing construction of new road, hence need for feasibility study. The feasibility study of alternatif new road construction (Cemorokandang - Tlogowaru) pay attention 9 (nine) policies Malang city and of course development feasibility analysis. After, both of result analysis known, then it can be determined viable alternative new road through (Analytical Hierarchy Process) AHP and scoring. Based on result AHP in expert choice application and scoring indicates that connecting road at Cemorokandang - Tlogowaru region is alternative trase 4.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 Agustina Ratri, Indhira Dwi Nanda
This work is licensed under a Creative Commons Attribution 4.0 International License.